|
|
22nd September 2025
GBRf delivered locomotives with an entritly new look for the 2025 Rail Head Treatment Train season on Monday 22nd September 2025. For as long as the RHTT contract has been operating in the southwest it has been operated by EWS/DB Schenker/ DB Cargo using Class 66 locomotives. The 2025 season will see GBRf taking the reigns with the set outbased from Fairwater Yard. No.57305 No.57303 lead No. 57310 'UK Railtours' south through Creech St Michael operating 6Z58 09:16 Eastleigh Yard - Taunton Loco Sidings with RHTT wagons 642031 and 642035 sandwiched between. The set will soon operate daily from Fairwater Yard departing at 18:20 each evening. This image was captured on a camera pole.
(Photo: Adam Snow)
|