TauntonTrains.co.uk

Silk Mills Road Bridge - April 2005

Silk Mills Road in Taunton links the A38 from Wellington to the A358 to Minehead and Norton Fitzwarren. The road name originates back to the 13th Century when Taunton was a prosperous wool making town. Although named Silk Mills Road, locally it has always referred to as 'Silk Mills'.| The road was originally built during the 1970s to link the Westernmost extremities of Taunton's roads, to give a good link between two main road arteries. Unfortunately, the floor in the plan was the railway. The road needed to cross the Bristol/ London to Exeter mainline at the South end of Fairwater Yard adjacent to Silk Mills Signal Box. Rather than construct a bridge, a flat road crossing with barriers was chosen. No one at the time could have predicted the traffic congestion problems that would occur some 35 - 40 years in the future.| During the 1990s traffic in the town had grown to such an extent that a large queue of cars was causing delays with traffic backing up onto other roads in the area while the barriers were in the down position. During evening rush hour periods it would not be uncommon to take nearly 20-30 minutes to negotiate the length of the road, due to the period's traffic was sat ideal waiting for trains to pass by. The County Council had to act, and after years of surveys, talks, meetings, and planning, a plan for Silk Mills Bridge was put forward to ease traffic congestion and incorporate a Park and Ride Scheme close by.| The Bridge would change the look of the area forever, it was a huge scheme, but it would also provide Taunton with a new vantage point to view train services in the area, and a way of reducing the traffic congestion in the town. Taunton Trains covered the event at the time because of its importance to the railway scene.| Silk Mills bridge became a local landmark and many have forgotten the old railway crossing ever existed. We hope this page will serve as a timely reminder of how the area has changed from its original construction in the 1970s through to the current day. It is however a tad ironic that despite the Country Council spending hundreds of thousands on this new road scheme that traffic congestion is in the area is now worse than ever. After the bridge construction and opening of the bridge planners saw fit to reduce the speed of the road down from a mixture of 40mph and 60mph to just 30mph throughout, and then installed a record number of traffic lights at various junctions over the entire length of the road. As a result travel times of 15 - 20 minutes over the length of the road at rush hour are no different to sitting in one position waiting for a train to pass!

15th January 2006
EWS Class 66 No.66227 is pictured at Silk Mills/ Fairwater Yard on the 15th January 2006. The loco at this point was in an engineering blockade being loaded with spent ballast from track replacement works at the north end of Fairwater Yard. In the background No.66081 is also visible on its train.
(Photo: Brian Garrett)


15th January 2006
Silk Mills Road Bridge on the 15th January 2006 just after opening.
(Photo: Brian Garrett)


15th January 2006
The view of the former route of Silk Mills Road just about visible on this image taken on the 15th September 2006, with the newly planted embankment for the Silk Mills Road.
(Photo: Brian Garrett)


15th January 2006
With the new Silk Mills Road bridge now open to traffic on the 15th January 2022, the old road crossing stands empty. The barriers in the up position due to an engineering blockade to allow the loading and unloading of road rail equipment.
(Photo: Brian Garrett)


15th January 2006
The loanely 'Gatso' which once stood to catch drivers jumping the lights are Silk Mills Road Crossing now standard redundant on the 15th January 2006 after the opening of the new road bridge.
(Photo: Brian Garrett)


15th January 2006
With the new Silk Mills Road bridge now open to traffic on the 15th January 2022, the old road crossing stands empty. The barriers in the up position due to an engineering blockade to allow the loading and unloading of road rail equipment.
(Photo: Brian Garrett)


15th January 2006
With the new Silk Mills Road bridge now open to traffic on the 15th January 2022, the old road crossing stands empty. The barriers in the up position due to an engineering blockade to allow the loading and unloading of road rail equipment.
(Photo: Brian Garrett)


15th January 2006
A view of Silk Mills from Roughmoor on the 15th January 2006, not long after the new road bridge had opened and work to decommission the former road alignment had started.
(Photo: Brian Garrett)


7th August 2005
The exisiting Silk Mills Road is pictured on the 7th August 2005, with the new down ramp and alignment being formed to the right of the current road.
(Photo: Brian Garrett)


7th August 2005
The newly installed Silk Mills road bridge is seen from the top deck of a London Transport routemaster on the 7th August 2005.
(Photo: Brian Garrett)


2nd April 2005
The new Silk Mills road bridge is lifted from its construction location into its final position spanning the railway lines on the 2nd April 2005.
(Photo: Brian Garrett)


2nd April 2005
The new Silk Mills road bridge is lifted from its construction location into its final position spanning the railway lines on the 2nd April 2005.
(Photo: Brian Garrett)


2nd April 2005
The new Silk Mills road bridge is lifted from its construction location into its final position spanning the railway lines on the 2nd April 2005.
(Photo: Brian Garrett)


2nd April 2005
The new Silk Mills road bridge is lifted from its construction location into its final position spanning the railway lines on the 2nd April 2005.
(Photo: Brian Garrett)


2nd April 2005
The new Silk Mills road bridge is lifted from its construction location into its final position spanning the railway lines on the 2nd April 2005.
(Photo: Brian Garrett)


2nd April 2005
Taken on the 2nd April 2005, as the huge Sarens crane takes the load of the new Silk Mills road bridge to lift into position.
(Photo: Brian Garrett)


2nd April 2005
Touchdown! The Silk Mills road bridge lands in its new location, in a lifting operating which took one hour. The bridge is pictured on the 2nd April 2005.
(Photo: Brian Garrett)


2nd April 2005
The new Silk Mills road bridge is lifted from its construction location into its final position spanning the railway lines on the 2nd April 2005.
(Photo: Brian Garrett)


2nd April 2005
The new Silk Mills road bridge is lifted from its construction location into its final position spanning the railway lines on the 2nd April 2005.
(Photo: Brian Garrett)


1st April 2005
Traffic ques on the busy Silk Mills Road on the 1st April 2005 waiting for a passing train. The next day the new road bridge would be lifted into position by the gian Sarens crane located on the left of this image.
(Photo: Brian Garrett)


Next Page
You are currently on Page 1 of 2 pages.

Back to Gallery Home