TauntonTrains.co.uk

Silk Mills Road Bridge - April 2005

Silk Mills Road in Taunton links the A38 from Wellington to the A358 to Minehead and Norton Fitzwarren. The road name originates back to the 13th Century when Taunton was a prosperous wool making town. Although named Silk Mills Road, locally it has always referred to as 'Silk Mills'.| The road was originally built during the 1970s to link the Westernmost extremities of Taunton's roads, to give a good link between two main road arteries. Unfortunately, the floor in the plan was the railway. The road needed to cross the Bristol/ London to Exeter mainline at the South end of Fairwater Yard adjacent to Silk Mills Signal Box. Rather than construct a bridge, a flat road crossing with barriers was chosen. No one at the time could have predicted the traffic congestion problems that would occur some 35 - 40 years in the future.| During the 1990s traffic in the town had grown to such an extent that a large queue of cars was causing delays with traffic backing up onto other roads in the area while the barriers were in the down position. During evening rush hour periods it would not be uncommon to take nearly 20-30 minutes to negotiate the length of the road, due to the period's traffic was sat ideal waiting for trains to pass by. The County Council had to act, and after years of surveys, talks, meetings, and planning, a plan for Silk Mills Bridge was put forward to ease traffic congestion and incorporate a Park and Ride Scheme close by.| The Bridge would change the look of the area forever, it was a huge scheme, but it would also provide Taunton with a new vantage point to view train services in the area, and a way of reducing the traffic congestion in the town. Taunton Trains covered the event at the time because of its importance to the railway scene.| Silk Mills bridge became a local landmark and many have forgotten the old railway crossing ever existed. We hope this page will serve as a timely reminder of how the area has changed from its original construction in the 1970s through to the current day. It is however a tad ironic that despite the Country Council spending hundreds of thousands on this new road scheme that traffic congestion is in the area is now worse than ever. After the bridge construction and opening of the bridge planners saw fit to reduce the speed of the road down from a mixture of 40mph and 60mph to just 30mph throughout, and then installed a record number of traffic lights at various junctions over the entire length of the road. As a result travel times of 15 - 20 minutes over the length of the road at rush hour are no different to sitting in one position waiting for a train to pass!

1st April 2005
Traffic ques on the busy Silk Mills Road on the 1st April 2005 waiting for a passing train. The next day the new road bridge would be lifted into position by the gian Sarens crane located on the left of this image.
(Photo: Brian Garrett)


1st April 2005
The night before the big lift of the new Silk Mills Road Bridge the Sarens Crane and bridge structure can be seen at sunset on the 1st April 2005.
(Photo: Brian Garrett)


1st April 2005
Traffic ques on the busy Silk Mills Road on the 1st April 2005 waiting for a passing train. The next day the new road bridge would be lifted into position by the giant Sarens crane located on the left of this image.
(Photo: Brian Garrett)


1st April 2005
The night before the big lift of the new Silk Mills Road Bridge the Sarens Crane and bridge structure can be seen at sunset on the 1st April 2005.
(Photo: Brian Garrett)


26th March 2005
A long queue of traffic forms at Silk Mills road crossing on the 26th March 2005 as a Virgin Voyager passes heading south. Adjacent is the newly constructed road bridge which will soon span the railway to allow traffic to pass freely over the top.
(Photo: Brian Garrett)


26th March 2005
The new Silk Mills road bridge pictured on the 26th March 2005 a week before being lifted into position over the railway tracks at Silk Mills Level Crossing.
(Photo: Brian Garrett)


26th March 2005
Sections of the Sarens Crane had started to be develired to the Silk Mills Brige lift site on the 26th March 2005.
(Photo: Brian Garrett)


26th March 2005
A view looking towards Bindon Road along Silk Mills Road, the area to the left being prepeared for the crane to be erected during the following week on the 26th March 2005.
(Photo: Brian Garrett)


26th March 2005
Silk Mills - This pillbox is in fact a sentry post and was one of several guarding the supply depot. It takes the form of a tower c 16ft high and c. 8 ft square built of concrete and brick. The entrance leads to a small basement less than 4 ft high from which a steel ladder passed through a hatch into the viewing room with slit windows. The ladder continued to the roof.
(Photo: Brian Garrett)


26th March 2005
The two concrete butress support structures formed in concrete can be seen adjacent to Silk Mills Road on the 26th March 2005.
(Photo: Brian Garrett)


26th March 2005
A view on the newly constructed overbridge for Silk Mills road crossing, taken on the 26th March 2005, a week before it was lifted into position.
(Photo: Brian Garrett)


26th March 2005
The Northside concrete butress support for the new Silk Mills Road bridge taken on the 26th March 2005.
(Photo: Brian Garrett)


26th March 2005
A side profile view of the new Silk Mills Road overbridge taken on the 26th March 2005 prior to being lifted into position the next week.
(Photo: Brian Garrett)


26th March 2005
A view looking along Silk Mills Road towards Bindon Road on the 26th March 2005 with the new overbridge having its finishing touches applied before being lifted into place the following weekend.
(Photo: Brian Garrett)


Previous Page
You are currently on Page 2 of 2 pages.

Back to Gallery Home