TauntonTrains.co.uk

9th May 2013
The scene at 40 Steps on the 9th May 2013 shows more changing times in the Taunton area. Very soon the new head shunt will be fully formed and connected to allow engineers to remove the former head shunt to make way for the new Taunton NIDR road project. The scene looking east from 40 Steps is captured here, and shows alignment of the new Fairwater Yard head shunt and small stabling complex located behind Platform 1. No.66616 and No. 66601 'The Hope Valley' had arrived back from Norton Fitzwarren as 6C76 12:40 Norton Fitzwarren - Fairwater Yard.
(Photo: Jeff Treece)


9th May 2013
The scene at 40 Steps on the 9th May 2013 shows more changing times in the Taunton area. Very soon the new head shunt will be fully formed and connected to allow engineers to remove the former head shunt to make way for the new Taunton NIDR road project. The scene looking east from 40 Steps is captured here, and shows alignment of the new Fairwater Yard head shunt and small stabling complex located behind Platform 1. No.66616 and No. 66601 'The Hope Valley' had arrived back from Norton Fitzwarren as 6C76 12:40 Norton Fitzwarren - Fairwater Yard.
(Photo: Jeff Treece)