|
|
19th October 1998
A Mainline and Loadhaul Class 37 pairing take the relief line at 40 Steps from Taunton Station on the 19th October 1998. No.37803 leads No.37513 south while operating the loaded 7Z85 12:45 Merehead - Exeter Riverside aggregate flow. During 1998 two trains a day were operating in conjunction with the A30 expansion.
(Photo: David Jones)
|
|
|
19th October 1998
A Mainline and Loadhaul Class 37 pairing take the relief line at 40 Steps from Taunton Station on the 19th October 1998. No.37803 leads No.37513 south while operating the loaded 7Z85 12:45 Merehead - Exeter Riverside aggregate flow. During 1998 two trains a day were operating in conjunction with the A30 expansion.
(Photo: David Jones)
|